Process

From first call to final walk-through

Four steps, one project manager, no surprise change orders.

  1. Estimate

    Tell us about your project. We reply within one business day with next steps and a ballpark range, then walk the site with you.

    You
    Send the form or call. Share a few photos of the space and what you have in mind.
    We
    Site visit, measurements, and a written, itemized estimate that includes permits and engineering.
    Timing
    Reply within one business day, then we schedule the site visit.
  2. Design

    Material selection and drawings tailored to your home, sized to its proportions and roofline.

    You
    Choose style, roofing, ceiling finish, lighting, and fans from samples we bring to you.
    We
    Architectural drawings, wind-load engineering where required, and the HOA package if your neighborhood needs one.
    Timing
    Runs alongside the permit submission.
  3. Permit

    We handle every city permit and HOA submission so the build clears inspection on the first pass.

    You
    Sign the HOA form if your community requires an owner signature. That is usually all.
    We
    Submit plans, answer plan-review comments, and schedule inspections.
    Timing
    Permit approval usually takes one to two weeks depending on the city.
  4. Build

    In-house crew, one lead carpenter, daily progress updates, and a clean site at the end of every day.

    You
    Keep the work area clear and enjoy watching it come together.
    We
    Footings, framing, roofing, ceiling, electrical rough-in coordination, finish work, and a final walk-through with you.
    Timing
    Three to seven days on site for most patio covers; one to two weeks for larger outdoor living projects. Two to four weeks end to end.

Planning questions

  • Most projects begin 2-3 weeks after contract signing, which covers permit approval and material procurement. Fall and winter often have the shortest wait times.

  • Construction itself takes 3-7 days for most patio covers once permits are approved and materials arrive. End to end — contract, permit approval (1-2 weeks), material procurement, and build — plan on 2-4 weeks. We confirm a build date before work starts and keep one crew on your project until it's finished.

  • Yes. Nearly every city in the DFW metroplex — including Dallas, Fort Worth, Plano, Frisco, McKinney, and Arlington — requires a building permit for a patio cover. Structure1 handles the full permit process on every project: drawings, engineering letters where required, submission, and inspections. Permit approval usually takes 1-2 weeks depending on the city.

  • We require a deposit to secure materials and scheduling, with the remaining balance due upon project completion and your satisfaction. Many clients phase larger projects to manage cost; we can discuss the right structure during your free estimate.

  • Every project carries a 2-year workmanship warranty covering structural issues with the structure or slab.

Ready to start?

Step one is a free estimate. We reply within one business day.